Civil Engineering question and answers for July 08, 2023
- Q What are the steps to validate a bid estimate?
- Q Consider a rectangular channel with a variable width b andhorizontal channel bottom, a) Obtain the equation of water surfaceprofile (dy/dx) as function of Froude number and channel widthchange (db/dx) in...
- Q What are the key differences in analysis procedure forsway and now sway frames when using the slope deflection method?Can sketches also be made to better explain these differences
- Q Make a comparison between using one Theodolite forlayout different horizontal curves types and using Two Theodolitemethod, taking in consideration possible obstacles and thespecialty between horizontal curves types
- Q 4. Compute the area of the loop traverse using the coordinatemethod from northing and easting coordinates.5. Compute the bearing and length of each course (A-B, B-C, C-D,D-E,and, A-E) using inverse...
- Q The Lolla Hart hospital has a small activated sludge plant totreat its wastewater. The average daily hospital discharge is 1,500L per day per bed, and the average soluble BOD5 afterprimary...
- Q 1)in which area is allowed to use sulphate cement ?2)what is the measure that need to be taken while pouring cement inhot weather?
- Q You are the client of a proposed commercial building projectwhich will involve two [2]contractors. The project is expected to be started on June 1,2020 and to be completed on July...
- Q Discuss how shear failure can arise in reinforced concretemembers and how such failures can beavoided.                                                                                                                                   Â
- Q You are the qualified supervisor of the construction companythat was contracted for the [2] demolition of a 30-year-oldbuilding at Ghala, Muscat. In compliance to the nationallegislation, what precautionary measures shall...
- Q Following a closed traverse, the sum of the interior angles wasfound to vary from the calculated sum by 2 degrees, 30 minutes. Theangles were balanced by adding 30 minutes to...
- Q Q2. A flexible pavement is to be designed based on AASHTOmethod. The following are the characteristics of this pavement: R =90%, S0 = 0.40, Pi = 4.5, Pt = 2.0,...
- Q Explain how hydraulic jumps can be utilized in hydraulicstructures. Choose an example and be specific.
- Q explain the common failure modes associated with trackgeometry defects
- Q Q2. A flexible pavement is to be designed based on AASHTOmethod. The following are the characteristics of this pavement: R =90%, S0 = 0.40, Pi = 4.5, Pt = 2.0,...
- Q Design an I-section purlin for an industrial buildingto support the galvanizedcorrugated iron sheet roof with following details:Spacing of the truss = 5.0 meterSpacing of purlins = 1.5 metersInclination of main...
- Q The soil profile at a site consists of a clay layer 10 m thick,sandwich between two sand layers. The top sand layer has a densityof 1.9 Mg/m3 and is 5...
- Q 1. To minimize the chance of losses, what process should acontractor use for updating the schedule, if litigation isexpected?2. Explain how prefabrication can change the critical path of aschedule.3. For...
- Q \"the recommended audience strength of churches should betwo-third to get the optimum reverberation \" Justify the abovestatement
- Q who is the truest mockingbird in \"To Kill aMockingbird \"?
- Q How to calculate friction losses.I. Write the calculation methods in detail by specifying thetables, abacs and diagrams used.ii. Losses depend on what parameters.can you please help this question. This is...
- Q Design a square interior column footing for a 15-in. square tiedinterior column that supports a dead load of 160 kips and live loadof 180 kips. The column is reinforced with...
- Q You have to write a Descriptive Paragraph on Someone youknow well. the paragraph should be between 150-200words.Note: Do not copy and paste from the internet. (avoidPlagiarism)
- Q I received a model of a reinforced concrete office buildingdesign in Revit from a coworker, and I’d like to get started onsome of the sheets that will make up the...
- Q Exercise #1. Analyze an actual project recently built in your area.Identify the major activities that occurred in each of the projectphases and who accomplished them. Develop a flowchart or networkdiagram...
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
- Unlimited Question Access with detailed Answers
- Zin AI - 3 Million Words
- 10 Dall-E 3 Images
- 20 Plot Generations
- Conversation with Dialogue Memory
- No Ads, Ever!
- Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!