Valley View Trailmasters makes two types of tents for mountain camping, the Explorer and the Climber. Data concerning the two product lines is presented in the table below:
EXPLORER
CLIMBER
Sales price per unit
$390
$615
Direct materials per unit
$92
$115
Direct labor per unit
$51
$75
Estimated annual production
4,000 units
9,000 units
The company has always employed a tradition costing system in which manufacturing overhead is applied to units based on machine hours. Estimated data concerning manufacturing overhead and direct labor hours for the upcoming year appear below:
Estimated total manufacturing overhead $484,746
Estimated total machine hours 1,000
The company is considering replacing its traditional costing system with an activity based costing system that would assign its indirect product costs to four activity cost pools. Information about the amount assigned to these cost pools, the identified cost driver for each and usage of the cost drivers by the two product lines is presented in the following table:
ACTIVITY
TOTAL COST
COST DRIVER
TOTAL
EXPLORER
CLIMBER
Machine maintenance
$78,840
Machine hours
1,000
350
650
Batch setups
$136,364
Setups
146
60
86
Quality control
$163,020
Inspections
1,650
975
675
Technical support
$106,522
Technical support calls
964
352
612
Total manufacturing overhead cost
$484,746
INSTRUCTIONS: Use EXCEL FROMULAS (Show them to next the value) to calculate the following amounts in the spaces provided on your template.
1. Calculate the predetermined overhead rate using the traditional volume-based costing system.
2. Calculate the total amount of overhead cost that would be assigned to each product line under the companys traditional costing system.
3. Calculate the gross margin per unit for each product line using traditional volume-based costing.
4. Calculate the activity rate for each cost pool using activity-based costing.
5. Calculate the total amount of overhead cost that would be assigned to each product line using activity-based costing.
6. Calculate the gross margin per unit for each product line under the proposed activity based costing system.
Here is the attached template:
Show formulas as well as the values.
EXPLORER
CLIMBER
ACTIVITY
TOTAL COST
COST DRIVER
TOTAL
EXPLORER
CLIMBER
Sales price per unit
$390
$615
Machine maintenance
$78,840
Machine hours
1,000
350
650
Direct materials per unit
$92
$115
Batch setups
$136,364
Setups
146
60
86
Direct labor per unit
$51
$75
Quality control
$163,020
Number of inspections
1650
975
675
Technical support
$106,522
Number of support calls
964
352
612
Estimated annual production
4000 units
9000 units
Total manufacturing overhead cost
$484,746
Estimated total manufacturing overhead:
$ 484,746
Estimated total machine hours:
1,000
Calculate the predetermined overhead rate using traditional
volume-based costing
Calculate the total amount of overhead that would be assigned to each product line
using traditional volume-based costing
EXPLORER
CLIMBER
Calculate the gross margin per unit for each product line using traditional volume-based costing
EXPLORER
CLIMBER
Calculate the activity rate for each cost pool using activity-based costing
ACTIVITY
RATE
Machine maintenance
Batch setups
Quality control
Labor support
Calculate the total amount of overhead that would be assigned to each product line
using activity-based costing
EXPLORER
CLIMBER
Calculate the gross margin per unit for each product line using activity-based costing
EXPLORER
CLIMBER
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!