§Take any two sectors (cement/ automobiles/ oil/ bottled drinking water, garments/ furniture/ refrigerators, etc) and draw their...

80.2K

Verified Solution

Question

Mechanical Engineering

§Take any two sectors (cement/ automobiles/ oil/ bottleddrinking water, garments/ furniture/ refrigerators, etc) and drawtheir distribution/supply networks.

§ Comment on their supply chain uncertainty

§ Identify 4 or more supply chain metrics of each sector’ssupply chain.

Draw/Paste supply chain network of sector-1

Draw/Paste supply chain network of sector-2

Attribute

Sector-1

Sector-2

Quantity of product needed in each lot

Response time that customers are willing to tolerate

Variety of products needed

Service level required

Desired rate of innovation in the product

Supply Chain metrics Sector1 and 2

Answer & Explanation Solved by verified expert
3.6 Ratings (326 Votes)
Sector 1 AutomobileAutomotive IndustrySector 2 Bottled Drinking waterAThe quantity of product needed in each lot 1 individualcomponents are manufactured 2 Multiple liters of water can beused depending on the tank capacityBResponse time 1 It deals with high Economic Strategieslosing one customer with less response is a huge problem 2 It canbe compensated easily    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students