If direct materials cost $1,200,000; direct labour costs $600,000 and manufacturing overhead costs $400,000 how much is the prime costs.
a. $2,200,000 b. $1,000,000 c. $1,200,000 d. $1,800,000standard costing and variance analysis
Answer & Explanation
Solved by verified expert