Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly-line balancing. She has...

70.2K

Verified Solution

Question

Advance Math

Dr. Lori Baker, operations manager at Nesa Electronics, pridesherself on excellent assembly-line balancing. She has been toldthat the firm needs to complete 96 instruments per 24-hour day. Theassembly-line activities are: TASK. TIME (min). PREDECESSORS. A 3 —B 6 — C 7 A D 5 A, B E 2 B F 4 C G 5 F H 7 D, E I 1 H J 6 E K 4 G,I, J Total 50 Draw the precedence diagram. If the daily (24-hour)production rate is 96 units, what is the highest allowable cycletime? minutes. If the cycle time after allowances is given as 10minutes, what is the daily (24-hour) production rate? units perday. With a 10-minute cycle time, what is the theoretical minimumnumber of stations with which the line can be balanced? With a10-minute cycle time and six workstations, what is the efficiency?% What is the total idle time per cycle with a 10-minute cycle timeand six workstations? minutes.

Answer & Explanation Solved by verified expert
3.9 Ratings (575 Votes)
    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students