Direct labor or machine hours may not be the appropriate costdriver for overheadin all...Direct...

80.2K

Verified Solution

Question

Accounting

Direct labor or machine hours may not be the appropriate costdriver for overhead

in all areas of manufacturing due to the complexities of manymanufacturing

processes. Many companies use activity-based costing (ABC) whichuses multiple drivers

(items that consume resources) rather than just one driver toapply overhead to their

activities. With ABC, a company can use a cost driver that has adirect cause/effect relationship

in its applied overhead costs.

Evian looked into ABC as a method of costing because of thevariety of items it

produces and the many different activities in which it isinvolved. The activities listed

below are a sample of possible cost pools for Evian.

Assembling

Payroll

Billing

Plant supervision

Digging trenches

Purchasing materials

Machine maintenance

Selling

Machine setups

Testing

Molding

Welding

Packaging

Instructions for part 4

(a) For each of these cost pools, what would be thelikely activity cost driver?

(b) Using the following information, determine theoverhead rates and the actual cost assigned for each of theactivity cost pools in a possible ABC system forEvian.

EVIAN CORPORATION

Expected

Use of                            Actual

Estimated          CostDrivers                            Use of

Activity CostPools                      Cost Drivers      Overhead          per Activity                            Drivers

Irrigationinstallation                   Labor cost         $1,999,500             12,900                                   12,941

Machining (all machine use)      Machine hours 1,670,400        33,408,000                            33,409,000

Customer orders                          # of orders              30,636                  2,553                                     2,520

Shipping                                        none(direct)                   N/A traced directly

Design                                            Cost per design           820                     10                                          7

Selling                                            Number of calls       372,300            21,900                                   22,100

(d) (1) The results of ABC can provide a more accuratepicture of costs. Discuss the value of Evian using this system todetermine overhead costs.

(2) How might using ABC affect decision making atEvian?

Answer & Explanation Solved by verified expert
4.0 Ratings (816 Votes)
a For each of these cost pools What would be the likely cost driver Cost pool cost driver Assembly Product assembled Payroll Number of employee on Payroll Billing Number of bills sent out Plant supervison supervisor hourss Digging trenches Number of trenches dug Purchasing Materials Number of purchases done Machine Maintenance Machine hours Selling Number of items sold Machine setup Number of setups Testing Number of test done Molding    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Transcribed Image Text

In: AccountingDirect labor or machine hours may not be the appropriate costdriver for overheadin all...Direct labor or machine hours may not be the appropriate costdriver for overheadin all areas of manufacturing due to the complexities of manymanufacturingprocesses. Many companies use activity-based costing (ABC) whichuses multiple drivers(items that consume resources) rather than just one driver toapply overhead to theiractivities. With ABC, a company can use a cost driver that has adirect cause/effect relationshipin its applied overhead costs.Evian looked into ABC as a method of costing because of thevariety of items itproduces and the many different activities in which it isinvolved. The activities listedbelow are a sample of possible cost pools for Evian.AssemblingPayrollBillingPlant supervisionDigging trenchesPurchasing materialsMachine maintenanceSellingMachine setupsTestingMoldingWeldingPackagingInstructions for part 4(a) For each of these cost pools, what would be thelikely activity cost driver?(b) Using the following information, determine theoverhead rates and the actual cost assigned for each of theactivity cost pools in a possible ABC system forEvian.EVIAN CORPORATIONExpectedUse of                            ActualEstimated          CostDrivers                            Use ofActivity CostPools                      Cost Drivers      Overhead          per Activity                            DriversIrrigationinstallation                   Labor cost         $1,999,500             12,900                                   12,941Machining (all machine use)      Machine hours 1,670,400        33,408,000                            33,409,000Customer orders                          # of orders              30,636                  2,553                                     2,520Shipping                                        none(direct)                   N/A traced directlyDesign                                            Cost per design           820                     10                                          7Selling                                            Number of calls       372,300            21,900                                   22,100(d) (1) The results of ABC can provide a more accuratepicture of costs. Discuss the value of Evian using this system todetermine overhead costs.(2) How might using ABC affect decision making atEvian?

Other questions asked by students