A CSTR activated sludge system is being designed for the Fulton Fish Processing Plant. The flow...

50.1K

Verified Solution

Question

Civil Engineering

A CSTR activated sludge system is being designed for the FultonFish Processing Plant. The flow is relatively small (0.25 mgd), butthe wastewater is strong due to all of the fish waste (BOD5 = 4500mg/L). Primary settling removes 20% of the BOD5. In order todischarge to the town sewer the BOD5 must be reduced to aconcentration that is 95% of the influent. What is the Dimensionsof the basin assuming a 3:1 L:W ratio. Also, what is the sludgeproduction rate?

Design Parameters

θc = 10 days

X = 2100 mg VSS/L

MLVSS is 75% of MLSS

Aeration Basin = 20 ft deep

Yobs = 0.3 mg MLSS/mg BOD5

Recycle Ratio = 50%

Answer & Explanation Solved by verified expert
3.9 Ratings (687 Votes)
    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students