You are considering two different methods for constructing a new warehouse site. The first method...

80.2K

Verified Solution

Question

Finance

You are considering two different methods for constructing a new warehouse site. The first method would use prefabricated building segments, would have an initial cost of $6.5 million, would have annual maintenance costs of $150,000, and would last for 25 years. The second alternative would employ a new carbon-fibre panel technology, would have an initial cost of $8.2 million, would have maintenance costs of $650,000 every ten years, and is expected to last 40 years. Both buildings would be in CCA Class 1 (at a rate of 4 percent) and it is expected that each would have a salvage value equivalent to 25 percent of its construction cost at the end of its useful life. The discount rate the firm uses in evaluating projects is 11 percent. The tax rate is 35 percent.

What is the annual cost for each option? (Enter the answers in dollars. Do not round your intermediate calculations. Round the final answers to 2 decimal places. Negative answers should be indicated by a minus sign.)

EAC
Pre-fab segments $
Carbon-fibre technology $

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students