You are asked to estimate the duration and cost of an excavation project. You are...
80.2K
Verified Solution
Link Copied!
Question
Finance
You are asked to estimate the duration and cost of an excavation project. You are given the area information referred to and the results of land investigations. This information includes: 1. The estimated work volume is 50,000 bcm. 2. In the project, there are 2 jobs, namely excavation and disposal of excess material. 3. The type of material on site is sandy silt with a material density of 1610 kg / m3 in the loose and 1825 conditions kg / m3 in original condition. For cellar excavation work, you choose to use a backhoe. Backhoe has specifications as follows: a. Capacity (lcm) 1.50 b. Cycle Time (minutes) 0.5 c. The average digging depth (m) is 5.6 d. Maximum digging depth (m) 8.5 e. Turning angle () 90 f. Efficiency 0.75 g. BFF 0.95 The excavated material is then dumped into an area 14 km from the project. Road conditions between excavation projects and the location of material disposal is quite good with RR 3% and GR as follows: 4 km + 6% Grade 5 km -7% Grade 5 km 0% Grade For disposal of this material, you choose to use the HD225-5 truck. The specifications of the truck are: a. Capacity: 17.7 m3 b. Empty weight: 22,450 kg c. Full weight: 47,525 kg d. Fill time: 3.5 min e. Unloading time: 3.0 min f. Efficiency 50 min / hour Using the information above, determine: 1. (15 points) Backhoe productivity 2. (20 points) Truck productivity 3. (7 points) Number of trucks needed if 2 backhoes are available for the job 4. (8 points) Duration of the project 5. (15 points) Estimate the cost of the project, with an estimated unit price as follows: i. The price of mobilization and demobilization of each backhoe is 3,000,000, - ii. The rental price for a backhoe with a capacity of 1.5 cm is 200,000, - / hour iii. Operator fee of 200,000 / day iv. Fuel costs 12,000, - / liter with a usage of 20 liters / hour for backhoe and 25 liters / day for trucks. v. The rental price for the truck is 600,000, - / day
vi. Truck driver wages 150,000 / day vii. Project overhead costs are 8% of the total above costs.
2.
If during the execution of the work above, one of the trucks was damaged on the afternoon of the 10th day so that the work became slow down. What is the duration of the work after the breakdown of one truck.
3.
Determine the amount of the project cost after truck damage occurs if every day the project delays, the contractor has to pay a fine of 1 per mile of the agreed upfront fee.
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!