You are a project manager. Attached you have a project definition provided by a Project Owner....

60.1K

Verified Solution

Question

Civil Engineering

You are a project manager. Attached you have a projectdefinition provided by a Project Owner. You have assisted the ownerin developing a brief scope based on the project objective. Fromthis limited scope you are to create a design proposal as anarchitectural(discipline)

1)Why are we doing this project? –Project objective provided byowner

2)What is needed to accomplish the end objective of the project?(plans, specifications, industry standards)

3)What is the cost to complete the project?

4)How much time is required to complete the project design?

5)Who will do the work? (i.e. with personnel in-house, or willit be subcontracted out to another firm)

Your proposal must include the scope of design services offered,the schedule for delivering these design services, and the budgetfor completing the design services rendered. You may also includebasic information about your company including history,qualifications, expertise, and past projects.This informationshould be a maximum of one page. Please include a graphic such aGantt(Bar) Chart for a schedule and/or a table for the budget orfee schedule

The Scenario:

Middle School Building Project: The new middle school buildingincludes classrooms, offices and administrative spaces, diningcommons with kitchen, and media center. Additional spaces that maybe part of the final design include auditorium,gymnasium andathletic fields. Building construction may consist of a multi-storymasonry and steel load bearing building with elevated slabs, pouredin-place concrete retaining walls and associated undergroundwaterproofing. Exterior finish materials may include brick veneer,aluminum storefront and curtain wall, and aluminum composite wallpanels. Interior finish materials may include masonry and drywallpartitions, brick veneer, cementitious terrazzo flooring, VCT andcarpet tile, and lay-in acoustical tile ceiling. Roofing systemsinclude TPO single ply roof system or standing seam metal roofingsystem. Building systems include forced air mechanical systems,plumbing, fire protection, electrical, communications, security anddata systems. Site construction consists of work on approximately20 acres, including erosion and sediment control measures, clearingand grubbing, storm water piping and retention ponds, building padpreparation, utilities including a forced main sanitary system,temporary and permanent parking areas and driveways, bus loop,concrete walks, areas of concrete, fencing and other miscellaneoussite work.

Answer & Explanation Solved by verified expert
3.6 Ratings (478 Votes)
    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students