XYZ company manufactures specialized wheel rims for large manufacturing machines. The company had originally used direct labor hours as the cost driver to develop one predetermined overhead rate.
You have been recently hired by this company to review the costing of this product and realize that maybe a predetermined overhead rate does not give an accurate cost picture.
You remember discussing overhead cost issues in MBA642 and want to implement ABC, so you have done some research and come up with the following activity cost pools and cost drivers.
Activity cost Pool Budgeted Overhead Cost Cost driver Budgeted Level for cost Driver Activity Pool Rate
Material Handling 72,000 Number of parts 24,000 $3.00
Inspections 18,000 Number of inspections 9,000
Insertion of parts 265,000 Number of parts 10,000
Finishing 200,000 Finishing department labor hours 20,000
Total Budgeted overhead cost $555,000
Total Direct Labor hours 15,000
Required: Round all answers to the nearest cent
1. Using the information above calculate the single predetermined overhead rate this company is using based on direct labor hours as the cost driver.
Predetermined overhead rate:
2. If the company uses the ABC approach, what would be the pool rates for the activities you have identified above.
I have computed the first activity pool rate above in column E and you should compute the remainder of the rates for the other activities.
3. The company produces two wheel rims as follows along with the usage of activities to make one standard rim and one deluxe rim:
Standard Deluxe
Parts per rim 5 7
Inpections 1 1
Finishing department labor hours per rim 3 5
Total direct labor hour per rim 5 8
If the company is using the predetermined overhead rate based on direct labor hours, what is the overhead cost for one rim of each wheel type?
Standard Deluxe
Total Overhead cost per each rim using a predetermined overhead rate
If the company is using the ABC method, what is the overhead cost for one rim of each type?
Standard Deluxe
Material Handling
Inspections
Insertion of parts
Finishing
Total Overhead cost for each rim using ABC
4. In addition to the overhead cost above, the rims have the following prime costs:
Standard Deluxe
Direct Materials 34 51
Direct Labor 48 54
Compute the Total product cost if the company uses the predetermined rate?
Compute the Total product cost if the company uses the ABC rate?
5. If there is not enough experienced labor to produce more standard and deluxe rims. The company is trying to maximize profits.
Below is the sales price per rim: Standard Deluxe
Sales price per rim $800.00 $1,000.00
Compute the profit for each rim using the total product cost that you feel is more accurate.
Standard Deluxe
Which rim should the company produce and which method did you use to compute the profit? Why did you use either the predetermined rate or the ABC rate in the total product cost?

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students