Why should a control station be observed at the start of a real-time kinematic survey? Thoroughly...

50.1K

Verified Solution

Question

Civil Engineering

Why should a control station be observed at the start of areal-time kinematic survey? Thoroughly explain your answer.

Answer & Explanation Solved by verified expert
3.8 Ratings (333 Votes)
The control station is observed at the start of a real timekinematic RTK survey because 1 To surround the project area with RTK control station inorder to achieve higher accuracy in construction projects2 Control station is used to achieve high accuracy such aspositioning upto 1cm1ppm accuracy rate3 If control station is used as horizontal    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students