Which of the following is considered a difference between a job order cost and a process cost system?
a. The manufacturing cost elements.
b. Documents used to track costs.
c. The accumulation of the costs of materials, labor, and overhead.
d. The flow of costs.
Answer & Explanation
Solved by verified expert