90.2K

Verified Solution

Question

Mechanical Engineering

What are the steps in producing a concrete slab on grade?

Answer & Explanation Solved by verified expert
3.8 Ratings (352 Votes)
FIRST you will need at a mimimum Hammer and saw a roller a concrete float boards a screed board concrete Then Clear the area and dig down as far as you want the slab to go below ground HINT Sidewalk pavers are approximately 2 thick but are not designed for heavy load bearing for long periods of time and for anything over 4 thick you should    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students