Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times MCE of about When last calculated, Waymouths MCE was Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics
products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth,
which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive
contract manufacturers have manufacturing cycle times MCE of about When last calculated, Waymouth's MCE was
Key measures from the recent month's production, averaged over all the jobs during that period, are as follows:
Required:
Determine the manufacturing cycle efficiency MCE for the recent month. Round your answer to decimal place ie
Key measures from the recent months production, averaged over all the jobs during that period, are as follows:
Activity Average Time hours
New product development
Materials handling
Order setup
Machine maintenance
Order scheduling
Inspection of completed order
Pack and move to storage or ship
Manufacturing assembly
Order taking and checking
Receiving and stocking raw materials
Inspection of raw materials at start of production