use the work below (pics 1-2) to answer the 4 questions shown below (pics 3-4)...

70.2K

Verified Solution

Question

Accounting

use the work below (pics 1-2) to answer the 4 questions shown below (pics 3-4)
work (pics 1-2)
image
image
questions (pics 3-4)
image
image
EXERCISE 4-8 COMPUTING ABC PRODUCT COSTS Performance Products Corporation makes two products, titanium Rims and Posts. Data regarding the two products follow: Additional information about the company follows: 2. Rims require $17 In direct materials per unit, and Posts require $10. b. The direct labor wage rate is $16 per hour. c. Rims are more complex to manufacture than Posts and they require special equipment. d. The ABC system has the following activity cost pools: Required: 1. Compute the activity rate for each activity cost pool. 2. Determine the unit product cost of each product according to the ABC system. \begin{tabular}{|c|c|c|c|c|c|} \hline B & c & D & E & F & G \\ \hline Activity & Estimated OH Cost & Uses & Rates =(Es & st cost/uses) & \\ \hline Machine Setups & 21,600 & 180 & 120 & =C2/D2 & \\ \hline Special Processing & 180,000 & 4,000 & 45 & =C3/D3 & \\ \hline General Factory & 288,000 & 24,000 & 12 & =C4/D4 & \\ \hline & & & & & \\ \hline \multicolumn{2}{|l|}{ Particulars } & Rim & Post & Rims & Posts \\ \hline Direct Materials & & & & 17 & 10 \\ \hline Direct Labor & (160.40)(160.20) & & & 6.4 & 3.2 \\ \hline \multicolumn{6}{|l|}{ Manufacturing Overhead: } \\ \hline Machine Setups & (rate*uses) & 12000 & 9600 & =120100 & =12080 \\ \hline Special Processing & & 180000 & 0 & =454000 & =450 \\ \hline General Factory & & 96000 & 192000 & =128000 & =1216000 \\ \hline Total Manufacturing Overhead & & 288000 & 201600 & =SUM(D10:D12)= & = SUM(E10:E12) \\ \hline Unit Produced & & 20000 & 80000 & & \\ \hline Manufacturing OH per unit & & 14.4 & 2.52 & =D13/D14 & =E13/E14 \\ \hline \multirow[t]{2}{*}{ Unit Product Cost } & & & & 37.8 & 15.72 \\ \hline & & & & =D15+F7+F8 & =E15+G8+G7 \\ \hline \end{tabular} Calculate the activity rate for machine setups in E4-8. QUESTION 2 Which activity suggests that the use of an ABC system is appropriate for the company in E48 ? A. Machine setups B. Special processing C. General factory QUESTION 3 Calculate the labor cost per unit for Rims in E4-8. Calculate the cost per unit for Posts in E4-8

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students