Tombro Industries is in the process of automating one of its plants and developing a flexible...

90.2K

Verified Solution

Question

Accounting

Tombro Industries is in the process of automating one of itsplants and developing a flexible manufacturing system. The companyis finding it necessary to make many changes in operatingprocedures. Progress has been slow, particularly in trying todevelop new performance measures for the factory.

In an effort to evaluate performance and determine whereimprovements can be made, management has gathered the followingdata relating to activities over the last four months:

Month
1234
Quality control measures:
Number ofdefects18516312491
Number ofwarranty claims46393027
Number ofcustomer complaints102967958
Material controlmeasures:
Purchase orderlead time8days7days5days4days
Scrap as apercent of total cost1%1%2%3%
Machineperformance measures:
Machine downtimeas a percentage of availability3%4%4%6%
Use as apercentage of availability95%92%89%85%
Setup time(hours)8101112
Deliveryperformance measures:
Throughputtime????
Manufacturingcycle efficiency (MCE)????
Delivery cycletime????
Percentage ofon-time deliveries96%95%92%89%

The president has read in industry journals that throughputtime, MCE, and delivery cycle time are important measures ofperformance, but no one is sure how they are computed. You havebeen asked to assist the company, and you have gathered thefollowing data relating to these measures:

Average per Month
(in days)
1234
Waittime per order before start
of production
9.011.512.014.0
Inspection timeper unit0.80.70.70.7
Process time perunit2.12.01.91.8
Queue time perunit2.84.46.07.0
Move time perunit0.30.40.40.5

Required:

1-a. Compute the throughput time for each month.

1-b. Compute the manufacturing cycle efficiency (MCE) for eachmonth.

1-c. Compute the delivery cycle time for each month.

3-a. Refer to the inspection time, process time, and so forth,given for month 4. Assume that in month 5 the inspection time,process time, and so forth, are the same as for month 4, exceptthat the company is able to completely eliminate the queue timeduring production using Lean Production. Compute the new throughputtime and MCE.

3-b. Refer to the inspection time, process time, and so forth,given for month 4. Assume that in month 6 the inspection time,process time, and so forth, are the same as in month 4, except thatthe company is able to eliminate both the queue time duringproduction and the inspection time using Lean Production. Computethe new throughput time and MCE.

Answer & Explanation Solved by verified expert
4.2 Ratings (511 Votes)
Ans Throughput Time Manufacturing Delivery Cycle Months Cycle Efficiency Time 1 6 days 350 15 days 2 75 days 2667 19 days 3 9 days 2111 21 days 4 10 days 1800 24 days Calculations for 1 a b c are shown below Ans 1 a Throughput time Move time Process time    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students