This is the template i have been using (required) but my excel formulas are not...

60.1K

Verified Solution

Question

Accounting

image

This is the template i have been using (required) but my excel formulas are not coming out right. Please show the excel formulas needed

image

. Problem 2 A company produces two basic products called A and B. Each week, the owner plans to assemble 25 of A and 10 of B. o The company produces 25 A and 10 B every week continuously, therefore order 25 A and 10 B every week o There is a current SR of 10 for G and Y at week 1 o Projected OH for G and Y are 0 and 60 respectively o G has the ordering policy of LFL(Lot for Lot) and LT(Lead time) = 1 o Y has the ordering policy of LFL, LT = 2 Given the information and BOM structure diagrams for A and B, complete the MRP table for component G and Y for the next seven weeks. B . A G F X Y N 13 (req 2) B D E F G H Indented Bill of Materials (s. Item name Level Indented BOM B G F Y X Y B G F Z Y B G F Z Z (reg 2 G SS=0 3 10 2 10 4 10 Lots Size= LFL 5 6 10 10 7 10 Lead Time= 1 1 10 10 0 0 Gross requirements Scheduled receipts Projected on-hand Projected on-hand - SS Net requirements Planned order receipts Planned orders release 0 0 -10 -10 10 0 10 -10 -10 10 30 10 -10 -10 10 40 10 -10 -10 10 50 10 -10 -10 10 60 10 -10 -10 10 70 10 Y 2 45 SS=0 3 45 4 45 Lots Size= LFL 5 6 45 45 7 25 Gross requirements Scheduled receipts Projected on-hand Projected on-hand -SS Net requirements Planned order receipts Planned orders release Lead Time= 2 1 45 10 60 25 60 25 -20 -20 20 0 -65 -65 65 0 -110 -110 110 0 - 155 -155 155 0 -200 -200 200 0 -225 -225 225 . Problem 2 A company produces two basic products called A and B. Each week, the owner plans to assemble 25 of A and 10 of B. o The company produces 25 A and 10 B every week continuously, therefore order 25 A and 10 B every week o There is a current SR of 10 for G and Y at week 1 o Projected OH for G and Y are 0 and 60 respectively o G has the ordering policy of LFL(Lot for Lot) and LT(Lead time) = 1 o Y has the ordering policy of LFL, LT = 2 Given the information and BOM structure diagrams for A and B, complete the MRP table for component G and Y for the next seven weeks. B . A G F X Y N 13 (req 2) B D E F G H Indented Bill of Materials (s. Item name Level Indented BOM B G F Y X Y B G F Z Y B G F Z Z (reg 2 G SS=0 3 10 2 10 4 10 Lots Size= LFL 5 6 10 10 7 10 Lead Time= 1 1 10 10 0 0 Gross requirements Scheduled receipts Projected on-hand Projected on-hand - SS Net requirements Planned order receipts Planned orders release 0 0 -10 -10 10 0 10 -10 -10 10 30 10 -10 -10 10 40 10 -10 -10 10 50 10 -10 -10 10 60 10 -10 -10 10 70 10 Y 2 45 SS=0 3 45 4 45 Lots Size= LFL 5 6 45 45 7 25 Gross requirements Scheduled receipts Projected on-hand Projected on-hand -SS Net requirements Planned order receipts Planned orders release Lead Time= 2 1 45 10 60 25 60 25 -20 -20 20 0 -65 -65 65 0 -110 -110 110 0 - 155 -155 155 0 -200 -200 200 0 -225 -225 225

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students