The total cycle time of an automated fiber placement (AFP) operation (sheet lamination), used to manufacture...

70.2K

Verified Solution

Question

Mechanical Engineering

The total cycle time of an automated fiber placement (AFP)operation (sheet lamination), used to manufacture a section of theairplane fuselage, is 8 hours and 40 minutes. The setup time beforethe start of the operation is 10 minutes. After each layer is putdown, an inspection stage is performed for 5 minutes. The AFP headrequires cleaning cycle of 3 minutes every 7 layers.

1. If the part is made of 20 layers, what is the time required(in minutes) to lay down 1 layer? (40 points)

2. What is the percentage of down time for this operation? (30points)

3. What is the total cycle time (in minutes) for making thispart, if the lay down speed was doubled? (30 points)

Answer & Explanation Solved by verified expert
3.6 Ratings (417 Votes)
Total cycle time8 hours 40 min 520 minsetup time before the operation starts is 10 minAfter every layer inspection time 5 minAfter every 3 layers cleaning cycle time 3 minAccording to given data    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students