Tata Wilmington Company has two manufacturing departments Assembly...

80.2K

Verified Solution

Question

Accounting

image
image
Tata Wilmington Company has two manufacturing departments Assembly and Fabrication. It considers all of its manufacturing overhead costs to be foed costs. The first set of data that is shown below is based on estimates from the beginning of the year. The second set of data relates to one particular job completed during the year-Job Bravo Estimated Data bly Tabrication Manufacturing overbes costs $ 2,218.000 32.550.000 34.000 Director hours 35.000 51,00 136.000 Machines 14,000 170.000 204,000 Sobe AY Total Direct labor.hr le 20 maines 13 23 Required: 1 Womington used a placwide predetermined overhead rate based on direct labor hours, low much facturing overhead would bepleto Job Bravo 2 Wimington uses departmental predetermined overhead rates with direct labor hours as the location base in Assembly and machine hours as the location base Fabrication, how much manufacturing overhead would be applied to Job Dravo Round your intermediate calculation to 2 decimal places) 1 Answer is complete but not entirely correct Fandag te we 5 1 2 Ft $ Wilmington Company has two manufacturing departments--Assembly and Fabrication. It considers all of its manufacturing overhead costs to be fixed costs. The first set of data that is shown below is based on estimates from the beginning of the year. The second set of data relates to one particular job completed during the year --Job Bravo Estimated Data Assembly Fabrication Total Manufacturing overhead costs 5 2,210,000 Direct labor-hours $ 2,550,000 $ 4,760,000 35.000 51,000 136.000 Machine-hours 34,000 170,000 264,000 Job Bravo Assembly Fabrication Total Direct labor-hours 18 10 28 Machine-hours 10 13 23 Required: 1. Wilmington used a plantwide predetermined overhead rate based on direct labor hours, how much manufacturing overhead would be applied to Job Bravo? 2. If Wilmington uses departmental predetermined overhead rates with direct labor hours as the allocation base in Assembly and machine hours as the allocation base in Fabrication, how much manufacturing overhead would be applied to Job Bravo? (Round your intermediate calculation to 2 decimal places.) 20 15 Answer is complete but not entirely correct. 1. Planwide manuaching overhead applied to Jel Brave $ 2 Manufacturing overhead applied from Assembly to Job Bravo s 2. Manutachang overhead pulled from action to Job Dravo s 2. Tutal departmental mandaling terhadapleto Job Breve 3

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students