Tailgator Company produces four versions of its model J7-21 bicycle seat. The four versions have...
70.2K
Verified Solution
Link Copied!
Question
Accounting
Tailgator Company produces four versions of its model J7-21 bicycle seat. The four versions have different shapes, but their processing operations and production costs are identical. During July, the following costs were incurred:
Direct materials:
Leather
$25,430
Metal frame
39,180
Bolts
3,010
Materials handling:
Labor
8,232
Equipment depreciation
4,410
Electrical power
2,460
Maintenance
5,184
Assembly:
Direct labor
13,230
Engineering design:
Labor
4,116
Electrical power
1,176
Engineering overhead
7,644
Overhead:
Equipment depreciation
7,056
Indirect labor
30,870
Supervision
17,640
Operating supplies
4,410
Electrical power
10,584
Repairs and maintenance
21,168
Building occupancy overhead
52,920
July's output totaled 29,400 units. Each unit requires three machine hours of effort. Materials handling costs are allocated to the products based on direct materials cost, engineering design costs are allocated based on units produced, and overhead is allocated based on machine hours. Assembly costs are allocated based on direct labor hours, which are estimated at 882 for July.
During July, Tailgator Company completed 520 bicycle seats for Job 14. The activity usage for Job 14 was as follows: direct materials, $1,150; direct labor hours, 15.
Required
1. Compute the following activity cost rates:
a. Compute the materials handling cost rate. % per dollar of materials
b. Compute the assembly cost rate. $ per direct labor hour
c. Compute the engineering design cost rate. Round your answer to the nearest cent. $ per unit
d. Compute the overhead rate. Round your answer to the nearest cent. $ per machine hour
2. Prepare a bill of activities for Job 14. Round per unit amounts to the nearest cent, and all other answers to the nearest whole dollar.
Tailgator Company Bill of Activities Job 14
Activity
Activity Cost Rate
Cost Driver Level
Activity Cost
Unit level
Materials handling
% per dollar of direct materials
$ direct materials
$
Assembly
$ per direct labor hour
direct labor hours
Batch level
None
Product level
Engineering design
$ per unit
units
Facility level
Overhead
$ per machine hour
machine hours
Total activity costs assigned to job
$
Total units of job
Activity costs per unit
$
3. Use activity-based costing to compute the job's total cost and product unit cost. Round activity costs to the nearest dollar, and round unit costs to the nearest cent.
Cost summary
Direct materials
$
Activity costs
Total cost of order
$
Product unit cost
$
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!