Transcribed Image Text
In: AccountingSweeten Company had no jobs in progress at the beginning ofMarch and no beginning inventories....Sweeten Company had no jobs in progress at the beginning ofMarch and no beginning inventories. The company has twomanufacturing departments--Molding and Fabrication. It started,completed, and sold only two jobs during March—Job P and Job Q. Thefollowing additional information is available for the company as awhole and for Jobs P and Q (all data and questions relate to themonth of March):MoldingFabricationTotalEstimated total machine-hours used2,5001,5004,000Estimated total fixed manufacturing overhead$10,750$15,450$26,200Estimated variable manufacturing overhead per machine-hour$1.70$2.50Job PJob QDirect materials$16,000$9,500Direct labor cost$23,400$8,700Actual machine-hours used:Molding2,0001,100Fabrication9001,200Total2,9002,300Sweeten Company had no underapplied or overapplied manufacturingoverhead costs during the month.Required:For questions 1-8, assume that Sweeten Company uses a plantwidepredetermined overhead rate with machine-hours as the allocationbase. For questions 9-15, assume that the company uses departmentalpredetermined overhead rates with machine-hours as the allocationbase in both departments.10. How much manufacturing overhead was applied from the MoldingDepartment to Job P and how much was applied to Job Q? (Donot round intermediate calculations.)11. How much manufacturing overhead was applied from theFabrication Department to Job P and how much was applied to Job Q?(Do not round intermediate calculations.)12. If Job P included 20 units, what was its unit product cost?(Do not round intermediate calculations.)13. If Job Q included 30 units, what was its unit product cost?(Do not round intermediate calculations. Round your finalanswer to nearest whole dollar.)14. Assume that Sweeten Company used cost-plus pricing (and amarkup percentage of 80% of total manufacturing cost) to establishselling prices for all of its jobs. What selling price would thecompany have established for Jobs P and Q? What are the sellingprices for both jobs when stated on a per unit basis assuming 20units were produced for Job P and 30 units were produced for Job Q?(Do not round intermediate calculations. Round your finalanswer to nearest whole dollar.)15. What was Sweeten Company’s cost of goods sold for March?(Do not round intermediate calculations.)
Other questions asked by students
Wilson Corp. is considering the purchase of a new piece of equipment. The cost savings from...
True or False: Profitability index is the PV of future cash flows divided by the initial...
Does the function y(t) = 4e-6t satisfy the following initial value problem?y' (t)-6y(t) = 0,...
A 24-inch board is to be cut into three pieces so that the second piece...
Gitano Products operates a job-order costing system and applies overhead cost to jobs on the...
(CO 1) In the American legal system, the burden of proof is placed upon O...