Suppose an office building is constructed for an owner. The punch list items are addressed, and...

80.2K

Verified Solution

Question

Civil Engineering

  1. Suppose an office building is constructed for an owner. Thepunch list items are addressed, and the project is accepted by theowner. Three months later during the winter season, the ownernoticed that the roof developed a small leak and that the leakingwater caused discoloration of several suspended ceiling tiles. Themain cause of the leakage is an issue in the roof installation andstructure that was not readialy observable during final inspectioncarried out by the owner’s representative. Suppose the owner thennoticed that the space between the bottom of three doors and thesurface of the floor was nearly ½ inch, exceeding the ¼ inch thatwas specified in the construction documents. (1) What type ofdefect is the roof issue? Should the roof repairs and thereplacement of the ceiling tiles be covered by warranty? Explainyour answer. (2) What type of defect is the extra space between thebottom of doors and the surface of the floor? Should the repaid ofthe space between the bottom of doors and the surface of the floorbe covered by warranty? Explain youranswer.    

Answer & Explanation Solved by verified expert
3.7 Ratings (350 Votes)
    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students