SC 301 Tractor Mower Co-Lean Six Sigma Team Assignment- Turn in with McDonald's French Fry...

60.1K

Verified Solution

Question

Accounting

image
SC 301 Tractor Mower Co-Lean Six Sigma Team Assignment- Turn in with McDonald's French Fry leach worth so Pts) a and Other Ideas to Reduce Mower Costs Selling Price (To Retailer) $1,600 Description Summary Cost Red'n Idea Est'd Cost Red'n*New Cost # Cost Elements (8 in Total) $ Values in Col'n $Values in Col'n Materials Cost per Mower 1 Mower & It's Parts 2 Plywood Protective Pke's $350 Kohler Steel Engine & Steel body w/foam seat $280 1/2 inch thick plywood $12 $10 Hardwood Pallet $652 3 Brass Hinges Sub Total Mtls Plant Labor Cost per Mower Shipping Crate Assembly Total DMC Mower Assembly 5 6 $100 Automated Prod'n Line at 20 per hour $10 Assemble Crate Manually $110 Plant Labor Rate $25/h 7 Transportation (Pre Cowan) $29 Rounded from $28.57 8 Warehouse Labor $4 $795 $805 COGS Gross Margin Gross Margin % 50% "Based on shipment of 1000 miles at $1 per mile in 53' Trailer with 45,000 lb loadable wt *Provide up to a 1/2 page for each idea with Assumptions and Financial Analysis Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees 2 paid 15 min breaks; One 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm. SC 301 Tractor Mower Co-Lean Six Sigma Team Assignment- Turn in with McDonald's French Fry leach worth so Pts) a and Other Ideas to Reduce Mower Costs Selling Price (To Retailer) $1,600 Description Summary Cost Red'n Idea Est'd Cost Red'n*New Cost # Cost Elements (8 in Total) $ Values in Col'n $Values in Col'n Materials Cost per Mower 1 Mower & It's Parts 2 Plywood Protective Pke's $350 Kohler Steel Engine & Steel body w/foam seat $280 1/2 inch thick plywood $12 $10 Hardwood Pallet $652 3 Brass Hinges Sub Total Mtls Plant Labor Cost per Mower Shipping Crate Assembly Total DMC Mower Assembly 5 6 $100 Automated Prod'n Line at 20 per hour $10 Assemble Crate Manually $110 Plant Labor Rate $25/h 7 Transportation (Pre Cowan) $29 Rounded from $28.57 8 Warehouse Labor $4 $795 $805 COGS Gross Margin Gross Margin % 50% "Based on shipment of 1000 miles at $1 per mile in 53' Trailer with 45,000 lb loadable wt *Provide up to a 1/2 page for each idea with Assumptions and Financial Analysis Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees 2 paid 15 min breaks; One 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students