Problem 4-15 Contrasting ABC and Conventional Product Costs [LO4-2, LO4-3, LO4-4] Marine, Inc., manufactures a...
80.2K
Verified Solution
Link Copied!
Question
Accounting
Problem 4-15 Contrasting ABC and Conventional Product Costs [LO4-2, LO4-3, LO4-4]
Marine, Inc., manufactures a product that is available in both a flexible and a rigid model. The company has made the rigid model for years; the flexible model was introduced several years ago to tap a new segment of the market. Since introduction of the flexible model, the companys profits have steadily declined, and management has become concerned about the accuracy of its costing system. Sales of the flexible model have been increasing rapidly.
Overhead is applied to products on the basis of direct labor-hours. At the beginning of the current year, management estimated that $672,000 in overhead costs would be incurred and the company would produce and sell 2,000 units of the flexible model and 10,000 units of the regular model. The flexible model requires 3.0 hours of direct labor time per unit, and the regular model requires 1.50 hours. Direct materials and labor costs per unit are given below:
Flexible
Rigid
Direct materials cost per unit
$
135
$
80
Direct labor cost per unit
$
30
$
15
Required:
1-a.Compute the predetermined overhead rate using direct labor-hours as the basis for allocating overhead costs to products.
1-b. Compute the unit product cost for one unit of each model.
2. An intern suggested that the company use activity-based costing to cost its products. A team was formed to investigate this idea. It came back with the recommendation that four activity cost pools be used. These cost pools and their associated activities are listed as follows:
Expected Activity
Activity Cost Pool and Activity Measure
Estimated Overhead Cost
Flexible
Rigid
Total
Purchase orders (number of orders)
$
25,000
150
475
625
Rework requests (number of requests)
15,000
85
290
375
Product testing (number of tests)
235,000
700
1,180
1,880
Machine related (machine-hours)
397,000
1,400
2,570
3,970
$
672,000
Compute the activity rate for each of the activity cost pools.
3-a. Using activity-based costing, determine the total amount of overhead that would be assigned to each model for the year.
3-b. Using activity-based costing, compute the unit product cost for one unit of each model.
Compute the predetermined overhead rate using direct labor-hours as the basis for allocating overhead costs to products.
Predetermined overhead rate
per DLH
Compute the unit product cost for one unit of each model.
Unit Product Cost
Flexible
Rigid
Compute the activity rate for each of the activity cost pools.
Activity Cost Pool
Activity Rate
Purchase orders
per order
Rework requests
per request
Product testing
per test
Machine-related
per MH
Using activity-based costing, determine the total amount of overhead that would be assigned to each model for the year
Total Amount of Overhead
Flexible
Rigid
Using activity-based costing, compute the unit product cost for one unit of each model. (Do not round intermediate calculations and round your answers to 2 decimal places.)
Unit Product Cost
Flexible
Rigid
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!