Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 The following information applies...

90.2K

Verified Solution

Question

Accounting

image

Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 The following information applies to the questions displayed below.] Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records Production Activity Grinding Polishing Product modification Providing power System calibration Indirect Labor Indirect MaterialsOther Overhead $320,000 600,000 500,000 $135,000 $255,000 Additional information on the drivers for its production activities follows 13,000 machine hours 13,000 machine hours Grinding Polishing Product modification Providing power System calibration 1,500 engineering hours 17,000 direct labor hours 400 batches Job 3175 200 units 550 MH Job 4286 2,500 units 5, 500 MH Number of units Machine hours Engineering hours Batches Direct labor hours 26 eng.hours 30 batches 32 eng.hours 90 batches 500 DLH 4,375 DLH Problem 17-3A Part 5 Required 5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) Plantwide OH rate Units Produced OH Cost per unit Product DL hours Total Overhead Cost Job 3175 74,650$ 0.00 Job 4286 0.00

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students