Please show all work. Thank you very much!

Problem 10-16 Comprehensive Variane Analysis [LO10-1, L010-2, LO10-3] Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below: Standard Quantity or Hours Standard Price or Rate Standard Cost $4.00 per yard Direct materials Direct labor per direct labor- $ 2 hour Variable manufacturing overhead Total standard cost per unit Overhead is applied to production on the basis of direct labor-hours. During March, 490 backpacks were manufactured and sold Selected information relating to the month's production is given below: Variable Materials Used $ 8,820 $ 7,035 Direct Manufacturing Labor $5,586 Overhead $1,176 $1,249 Total standard cost Actual costs incurred Materials price variance Materials quantity variance Labor rate variance Labor efficiency variance Variable overhead rate variance Variable overhead efficiency variance allowed* $ 560U For the month's production The following additional information is available for March's production 750 Actual direct labor-hours Difference between standard and actual cost per backpack $ 0.20 F produced during March Required Hint: It may be helpful to complete a general model diagram for direct materials, direct labor, and variable manufacturing overhead before attempting to answer any of the requirements 1. What is the standard cost of a single backpack? 2. What was the actual cost per backpack produced during March? 3. How many yards of material are required at standard per backpack? 4. What was the materials price variance for March if there were no beginning or ending inventories of materials? 5. What is the standard direct labor rate per hour? 6. What was the labor rate variance for March? The labor efficiency variance? 7. What was the variable overhead rate variance for March? The variable overhead efficiency variance? 8. Prepare a standard cost card for one backpack

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students