PLEASE SEE THE ERROR THAT I HAVE CORRECT ON THE QUESTION. PRODUCT C: 12,000 UNITS...
50.1K
Verified Solution
Link Copied!
Question
Accounting
PLEASE SEE THE ERROR THAT I HAVE CORRECT ON THE QUESTION. PRODUCT C: 12,000 UNITS
CoursHeroTranscribedText: a) Critically discuss three advantages of activity-based costing (ABC) over absorption costing. 20 Marks b) Pass Ltd produces two products (A and B). The monthly production is 20,000 units of A and 50,000 units of B. Product A is produced in batches of 1,000 units each time. Product B is produced in batches of 5,000 each time. The total set-up cost is f30,000 each month. Calculate the set-up cost per unit of product A using (i) production volume and (ii) production runs as the cost driver. Comment on your results. 30 Marks c) Duck Ltd. manufactures three products: A, B, and C. The monthly production output and sales of the products are as follows: Product A: 2,400 units Product B: 2,000 units Product C: 1,200 units PRODUCT C: UNIT 12,000 UNITS The company currently uses direct machine hours as its allocation base for all manufacturing overhead costs. The total estimated overhead cost for next month is 60.932m. Management is now considering switching to an activity-based costing system with four overhead activity cost pools: receiving orders, machine maintenance, processing, and quality control. The appropriate data concerning the estimated overhead costs and predicted activity levels are given below: Activity level Activities Estimated Activity A B C overhead driver costs (f) Receiving 42,000 No. or 50 40 60 order orders Machine 620,000 Machine 3600 21,000 7400 maintenance hours Processing 180,000 Labour 6200 18,500 12,00 hours Quality 90,000 No of 300 220 270 control inspection hoursRequired: Calculate the predetermined overhead rate under the traditional costing system. Calculate the overhead cost per unit of each product under the traditional coating system. Calculate the predetermined overhead rates for all activities under the activity-based costing system. Calculate each activity overhead cost per unit of every product under the activity-based costing system. Calculate the overhead cost of each product both in total and per unit under the activity-based costing system
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!