Patio Iron makes wrought iron outdoor dining tables, chairs, andstools. Each table uses 8 feet of a standard width wrought iron, 2hours of labor for cutting and assembly, and 2 hours of labor fordetail and finishing work. Each chair uses 6 feet of the wroughtiron, 2 hours of cutting and assembly labor, and 1.5 hours ofdetail and finishing labor. Each stool uses 1 foot of the wroughtiron, 1.5 hours for cutting and assembly, and 0.5 hour for detailand finishing work, and the daily demand for stools is at most 10.Each day Patio Iron has available at most 154 feet of wrought iron,55 hours for cutting and assembly, and 50 hours for detail andfinishing. If the profits are $60 for each dining table, $48 foreach chair, and $36 for each stool, how many of each item should bemade each day to maximize profit?