One unit of A is made of two units of B, three units of C, and twounits of D. B is composed of one unit of E and two units of F. C ismade of two units of F and one unit of D. E is made of two units ofD. Items A, C, D, and F have one-week lead times; B and E have leadtimes of two weeks. Lot-for-lot (L4L) lot sizing is used for ItemsA, B, C, and D; lots of size 60 and 200 are used for Items E and F,respectively. Item C has an on-hand (beginning) inventory of 10; Dhas an on-hand inventory of 50; all other items have zero beginninginventory. We are scheduled to receive 20 units of Item E in Week2; there are no other scheduled receipts.
If 20 units of A are required in Week 8, use the low-level-codedbill-of-materials to find the necessary planned order releases forall components. (Leave nocells blank - be certain to enter "0" whereverrequired.)
| Period | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Item A OH = 0 LT = 1 SS = 0 Q = L4L | Gross requirements | | | | | | | | |
Scheduledreceipts | | | | | | | | |
Projected onhand | | | | | | | | |
Netrequirements | | | | | | | | |
Planned orderreceipts | | | | | | | | |
Planned orderreleases | | | | | | | | |
| | | | | | | | | | | |
Item B OH = 0 LT = 2 SS = 0 Q = L4L | Grossrequirements | | | | | | | | |
Scheduledreceipts | | | | | | | | |
Projected onhand | | | | | | | | |
Netrequirements | | | | | | | | |
Planned orderreceipts | | | | | | | | |
Planned orderreleases | | | | | | | | |
| | | | | | | | | | | |
Item C OH = 10 LT = 1 SS = 0 Q = L4L | Grossrequirements | | | | | | | | |
Scheduledreceipts | | | | | | | | |
Projected onhand | | | | | | | | |
Netrequirements | | | | | | | | |
Planned orderreceipts | | | | | | | | |
Planned orderreleases | | | | | | | | |
| | | | | | | | | | | |
Item E OH = 0 LT = 2 SS = 0 Q = 60 | Grossrequirements | | | | | | | | |
Scheduledreceipts | | | | | | | | |
Projected onhand | | | | | | | | |
Netrequirements | | | | | | | | |
Planned orderreceipts | | | | | | | | |
Planned orderreleases | | | | | | | | |
| | | | | | | | | | | |
Item F OH = 0 LT = 1 SS = 0 Q = 200 | Grossrequirements | | | | | | | | |
Scheduledreceipts | | | | | | | | |
Projected onhand | | | | | | | | |
Netrequirements | | | | | | | | |
Planned orderreceipts | | | | | | | | |
Planned orderreleases | | | | | | | | |
| | | | | | | | | | | |
Item D OH = 50 LT = 1 SS = 0 Q = L4L | Grossrequirements | | | | | | | | |
Scheduledreceipts | | | | | | | | |
Projected onhand | | | | | | | | |
Netrequirements | | | | | | | | |
Planned orderreceipts | | | | | | | | |
Planned orderreleases | | | | | | | | |
|