Nine observations from a work measurement study using continuous timing are shown below. Allowances are...

50.1K

Verified Solution

Question

Accounting

Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, seven percent; fatigue, six percent; delay, six percent. Use the Work Measurement Excel template to determine the standard time for this operation.

Work Observation
Element 1 2 3 4 5 6 7 8 9 Performance Rating
A 0.11 0.15 0.09 0.08 0.12 0.11 0.16 0.15 0.16 95%
B 0.24 0.21 0.22 0.22 0.26 0.25 0.29 0.25 0.25 115%
C 0.46 0.48 0.46 0.45 0.50 0.50 0.48 0.46 0.49 90%
D 0.64 0.67 0.65 0.62 0.72 0.70 0.70 0.67 0.73 100%
E 0.71 0.76 0.72 0.70 0.80 0.82 0.77 0.79 0.82 85%
F 1.00 1.05 0.99 1.01 1.08 1.10 1.05 1.09 1.09 100%

Round your answer to two decimal places.

minutes

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students