Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There...

70.2K

Verified Solution

Question

Accounting

imageimageimage

Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There has been a long-simmering dispute between the company's estimator and the work supervisors. The on-site supervisors claim that the estimators do not adequately distinguish between routine work, such as removal of asbestos insulation around heating pipes in older homes, and nonroutine work, such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $2.80 to determine the bid price. Since our average cost is only $2.575 per square foot, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart." Skipped To shed light on this controversy, the company initiated an activity-based costing study of all of its costs. Data from the activity-based costing system follow: Activity Cost Pool Activity Measure Total Activity Removing asbestos Thousands of square feet 800 thousand square feet Estimating and job setup Number of jobs 400 jobs Working on nonroutine jobs Number of nonroutine jobs 100 nonroutine jobs Other (organization-sustaining costs and idle capacity costs) None Note: The 100 nonroutine jobs are included in the total of 400 jobs. Both nonroutine jobs and routine jobs require estimating and setup. Costs for the Year Wages and salaries Disposal fees Equipment depreciation On-site supplies Office expenses Licensing and insurance Total cost $ 372,000 775,000 96,000 58,000 280,000 480,000 $ 2,061,000 Other 10% Distribution of Resource Consumption Across Activities Estimating Working on Removing and Job Nonroutine Asbestos Setup Jobs Wages and salaries 60% 106 206 Disposal fees Equipment depreciation 50% 156 On-site supplies 20% 106 Office expenses 106 Licensing and insurance 25 Total 100% 100% 100% 100% 25% 20% 1005 06 1008 Required: 1. Perform the first stage allocation of costs to the activity cost pools. 2. Compute the activity rates for the activity cost pools. 3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system. a. A routine 1,000-square-foot asbestos removal job. b. A routine 2,000-square-foot asbestos removal job. c. A nonroutine 2,000-square-foot asbestos removal job. Complete this question by entering your answers in the tabs below. Req 1 Req 2 Req 3A to 30 Perform the first stage allocation of costs to the activity cost pools. Removing asbestos Estimating and Job Setup Working on Nonroutine Jobs Other Total Wages and salaries Disposal fees Equipment depreciation On-site supplies Office expenses Licensing and insurance Total cost 0S 0S 0S 0S 12 Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There has been a long-simmering dispute between the company's estimator and the work supervisors. The on-site supervisors claim that the estimators do not adequately distinguish between routine work, such as removal of asbestos insulation around heating pipes in older homes, and nonroutine work, such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $2.80 to determine the bid price. Since our average cost is only $2.575 per square foot, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart." Skipped To shed light on this controversy, the company initiated an activity-based costing study of all of its costs. Data from the activity-based costing system follow: Activity Cost Pool Activity Measure Total activity Removing asbestos Thousands of square feet 800 thousand square feet Estimating and job setup Number of jobs 400 jobs Working on nonroutine jobs Number of nonroutine jobs 100 nonroutine jobs Other (organization-sustaining costs and idle capacity costs) None Note: The 100 nonroutine jobs are included in the total of 400 jobs. Both nonroutine jobs and routine jobs require estimating and setup. Costs for the Year Wages and salaries Disposal fees Equipment depreciation On-site supplies Office expenses Licensing and insurance Total cost $ 372,000 775,000 96,000 58,000 280,000 480,000 $ 2,061,000 Distribution of Resource Consumption across Activities Estimating Working on Removing and Job Nonroutine Asbestos Setup Jobs 60% 108 Wages and salaries 206 Disposal fees 60% 400 Equipment depreciation 506 On-site supplies 70% 100 106 200 Office expenses Licensing and insurance 25 604 Other 10% Total 100% 100% 156 200 30% 15% 100% 100% 100% Required: 1. Perform the first stage allocation of costs to the activity cost pools. 2. Compute the activity rates for the activity cost pools. 3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system. a. A routine 1,000-square-foot asbestos removal job. b. A routine 2.000-square-foot asbestos removal job. c. A nonroutine 2,000-square-foot asbestos removal job. Complete this question by entering your answers in the tabs below. Req 1 Req2 Req 3A to 30 Compute the activity rates for the activity cost pools. Activity Cost Pool Removing asbestos Activity Rate per thousand square feet per job Estimating and job setup Working on nonroutine iobs per nonroutine job 12 Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There has been a long-simmering dispute between the company's estimator and the work supervisors. The on-site supervisors claim that the estimators do not adequately distinguish between routine work, such as removal of asbestos insulation around heating pipes in older homes, and nonroutine work, such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $2.80 to determine the bid price. Since our average cost is only $2.575 per square foot, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart." Skipped To shed light on this controversy, the company initiated an activity-based costing study of all of its costs. Data from the activity-based costing system follow: Activity Cost Pool Activity Measure Total Activity Removing asbestos Thousands of square feet 800 thousand square feet Estimating and job setup Number of jobs 400 jobs Working on nonroutine jobs Number of nonroutine jobs 100 nonroutine jobs Other (organization-sustaining costs and idle capacity costs) None Note: The 100 nonroutine jobs are included in the total of 400 jobs. Both nonroutine jobs and routine jobs require estimating and setup. Costs for the Year Wages and salaries Disposal fees Equipment depreciation On-site supplies Office expenses Licensing and insurance Total cost $ 372,000 775,000 96,000 58.000 280,000 480,000 $ 2,061,000 Other Distribution of Resource Consumption across Activities Estimating Working on Removing and Job Nonroutine Asbestos Setup Jobs Wages and salaries 10% 206 Disposal fees 60% 400 Equipment depreciation 50% On-site supplies 70% 200 100 Office expenses 200 Licensing and insurance 105 09 Total 100% 100% 2008 100% 156 25% 00 100 258 06 600 306 156 1005 Required: 1. Perform the first stage allocation of costs to the activity cost pools 2 Compute the activity rates for the activity cost pools. 3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system. a. A routine 1,000-square-foot asbestos removal job. b. A routine 2,000-square-foot asbestos removal job. c. A nonroutine 2,000-square-foot asbestos removal job. Complete this question by entering your answers in the tabs below. Reg 1 Reg 2 Reg 3A to 3d Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system. (Round the "Average Cost per thousand square feet" to 2 decimal places.) a. A routine 1,000-square-foot asbestos removal job. b. A routine 2,000-square-foot asbestos removal job. c. A nonroutine 2,000-square-foot asbestos removal job. Show less Routine Routine Nonroutine 1,000 sq. ft. 2,000 sq. ft. 2,000 sq. ft. job job job Total cost of the job Average Cost per thousand square feet

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students