Men at a construction site were moving concrete blocks from a truck, a short distance to...

80.2K

Verified Solution

Question

Basic Math

Men at a construction site were moving concrete blocks from atruck, a short distance to the base of a house. The first day theaverage man moved 62 blocks per hour.

The current day the numbers were :70,63,76,86,86,62,97,70,77,81

1. Assume all assumptions are met. Provide descriptivestatistics for the sample.

2. Conduct a statistical test to assess if the men were able tomove more than 62 blocks per hour.

3. The men had more rest than they did the first day and werecertain they could move atleast 5 more blocks per hour. Conduct astatistical test to see if they were able to, on average, move 5more plants per hour than the previous mark of 62

Answer & Explanation Solved by verified expert
4.4 Ratings (830 Votes)
    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students