Liz Ortega builds custom cabinets. The process usually begins with a preliminary visit to a potential customer location to take measurements and prepare a bid. Measurements and bidding are done by a salesperson. Many times, this preliminary visit does not result in an order. Once an order is received, there are a number of order-specific "shop setup" processes (calibrating saws, lathes, sanders, etc.). The "shop setup" process is the same no matter how many individual cabinets are produced for each order (i.e., some orders are for just a few cabinets, and some orders are for hundreds of identical units). Setup is followed by production, and the amount of time and labor is heavily correlated to the number of units produced in the order. The final step is delivery to the job site, and the cost for this activity is mostly a function of distance from shop to job site.
Liz has been applying factory overhead based on direct labor hours, and realizes that this costing model is sometimes ineffective in producing competitive and/or profitable bids. She has read about "activity-based costing" and is interested in perfecting her bidding process based upon ABC methodology.
Ortega's total cost for a recent period are as follows:
Direct material $ 300,000
Direct labor 200,000
Indirect material 40,000
Indirect labor 60,000
Shop depreciation 150,000
Shop maintenance 25,000
Other shop costs 35,000
Administrative salaries 90,000
Sales salaries 55,000
Transportation 20,000
Liz has examined her business and concluded that she has four basic activities: bidding, machine set up, production, and delivery. During the period for which the above costs were incurred, 75 jobs were bid, resulting in 25 orders. The ratio of bids to orders was about normal. Each order required a separate shop setup. There were 2,000 cabinets produced. Delivery distance for the orders totaled 4,000 miles. Ortega conducted a study to determine the portion of each cost category that is attributable to the four activities. The results of this study are summarized in the following table.
Bidding Set Up Production Delivery Unallocated
Indirect material 5% 15% 75% 5% 0%
Indirect labor 10% 20% 50% 20% 0%
Shop depreciation 0% 15% 80% 5% 0%
Shop maintenance 0% 40% 55% 5% 0%
Other shop costs 0% 60% 40% 0% 0%
Administrative salaries 20% 0% 25% 10% 45%
Sales salaries 95% 5% 0% 0% 0%
Transportation 30% 0% 0% 60% 10%
(a) Determine the total cost of each activity, and calculate a cost per unit of measure.
(b) Ortega's salesperson has been asked to bid on an order involving 50 cabinet units. Delivery requires 60 miles of driving. If the goal is to price orders at 200% of the activity-based cost (including direct material and direct labor, but excluding unallocated costs), what price should be quoted?

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students