Kelso Manufacturing allocates manufacturing overhead using a single predetermined rate based on a planned use...

70.2K

Verified Solution

Question

Accounting

Kelso Manufacturing allocates manufacturing overhead using a single predetermined rate based on a planned use of 15,000 direct labour hours per year. Company leadership recently learned that its costing system may be too simple for its operations, and that job costs may be fairly inaccurate. A consultant was hired to study overhead costs, and the following information reflects the cost pools and activity rates that were determined:

image

Job #156 required 25 purchase orders, 400 direct labour hours, 50 production runs, and 100 inspections. If a traditional costing system was used, this job would be:

a. Overcosted by $35

b. Overcosted by $80

c. Undercosted by $80

d. Undercosted by $35

\begin{tabular}{|c|c|c|} \hline Cost Pool & Total Cost & Activity Rate \\ \hline Purchasing & $90,000 & $30/ purchase order \\ \hline Assembly & $150,000 & $10/directlabourhour \\ \hline Inspection & $60,000 & $15/ inspection \\ \hline Production & $150,000 & $3/ unit produced \\ \hline Total & $450,000 & \\ \hline \end{tabular}

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students