Just need the answer to compare it Thanks for your help! new highway is to...
70.2K
Verified Solution
Question
Finance
Just need the answer to compare it Thanks for your help!
new highway is to be constructed. Design A calls for a concrete pavement costing
$9090
per foot with a
2020-year
life;
twotwo
paved ditches costing
$33
per foot each; and
threethree
box culverts every mile, each costing
$9 comma 0009,000
and having a
2020-year
life. Annual maintenance will cost
$1 comma 8001,800
per mile; the culverts must be cleaned every
fivefive
years at a cost of
$450450
each per mile.Design B calls for a bituminous pavement costing
$4545
per foot with a
1010-year
life;
twotwo
sodded ditches costing
$1.501.50
per foot each; and
threethree
pipe culverts every mile, each costing
$2 comma 2502,250
and having a
1010-year
life. The replacement culverts will cost
$2 comma 4002,400
each. Annual maintenance will cost
$2 comma 7002,700
per mile; the culverts must be cleaned yearly at a cost of
$225225
each per mile; and the annual ditch maintenance will cost
$1.501.50
per foot per ditch.Compare the two designs on the basis of equivalent worth per mile for a
2020-year
period. Find the most economical design on the basis of AW and PW if the MARR is
66%
per year.
LOADING...
Click the icon to view the interest and annuity table for discrete compounding when the MARR is
66%
per year.
The AW value for Design A is
$nothing/mi.
(Round to the nearest hundreds.)The PW value for Design A is
$nothing/mi.
(Round to the nearest hundreds.)The AW value for Design B is
$nothing/mi.
(Round to the nearest hundreds.)The PW value for Design B is
$nothing/mi.
(Round to the nearest hundreds.)The most economical design on the basis of AW and PW is
Design B
Design A
.
A new highway is to be constructed. Design A calls for a concrete pavement costing $90 per foot with a 20-year life; two paved ditches costing $3 per foot each; and three box culverts every mile, each costing $9,000 and having a 20-year life. Annual maintenance will cost $1,800 per mile; the culverts must be cleaned every five years at a cost of $450 each per mile. Design B calls for a bituminous pavement costing $45 per foot with a 10-year life; two sodded ditches costing $1.50 per foot each; and three pipe culverts every mile, each costing $2,250 and having a 10-year life. The replacement culverts will cost $2,400 each. Annual maintenance will cost $2,700 per mile; the culverts must be cleaned yearly at a cost of $225 each per mile, and the annual ditch maintenance will cost $1.50 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 20-year period. Find the most economical design on the basis of AW and PW if the MARR is 6% per year. Click the icon to view the interest and annuity table for discrete compounding when the MARR is 6% per year. The AW value for Design A is $ /mi. (Round to the nearest hundreds.) The PW value for Design A is $ /mi. (Round to the nearest hundreds.) The AW value for Design B is $ /mi. (Round to the nearest hundreds.) The PW value for Design B is $ /mi. (Round to the nearest hundreds.) The most economical design on the basis of AW and PW isGet Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
- Unlimited Question Access with detailed Answers
- Zin AI - 3 Million Words
- 10 Dall-E 3 Images
- 20 Plot Generations
- Conversation with Dialogue Memory
- No Ads, Ever!
- Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Other questions asked by students
StudyZin's Question Purchase
1 Answer
$0.99
(Save $1 )
One time Pay
- No Ads
- Answer to 1 Question
- Get free Zin AI - 50 Thousand Words per Month
Unlimited
$4.99*
(Save $5 )
Billed Monthly
- No Ads
- Answers to Unlimited Questions
- Get free Zin AI - 3 Million Words per Month
*First month only
Free
$0
- Get this answer for free!
- Sign up now to unlock the answer instantly
You can see the logs in the Dashboard.