Question

Civil Engineering

Imagine that you are assigned in a road way project and youfound out that the soil is a non-cohesive week soil, design a workplan in order to stabilize this soil, taking into account the cost,materials, labor and the strength to be obtained

Answer & Explanation Solved by verified expert
3.9 Ratings (649 Votes)
STABILIZATION METHOS 1 stabilisation with cementatious material In this methode the soil stabilization is done by using stabilizing agent without removing the bulk soil This type of techniques used for deep and shallow foundations this method is done    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students