Hi-Tek Manufacturing, Inc., makes two types of industrialcomponent parts—the B300 and the T500. An absorption costing incomestatement for the most recent period is shown:
Hi-Tek Manufacturing Inc. Income Statement |
Sales | $ | 1,755,600 | |
Cost of goods sold | | 1,217,906 | |
Gross margin | | 537,694 | |
Selling and administrative expenses | | 590,000 | |
Net operating loss | $ | (52,306 | ) |
|
Hi-Tek produced and sold 60,200 units of B300 at a price of $21per unit and 12,600 units of T500 at a price of $39 per unit. Thecompany’s traditional cost system allocates manufacturing overheadto products using a plantwide overhead rate and direct labordollars as the allocation base. Additional information relating tothe company’s two product lines is shown below:
| B300 | T500 | Total |
Direct materials | $ | 400,600 | $ | 162,800 | $ | 563,400 |
Direct labor | $ | 120,500 | $ | 42,600 | | 163,100 |
Manufacturing overhead | | | | | | 491,406 |
Cost of goods sold | | | | | $ | 1,217,906 |
|
The company has created an activity-based costing system toevaluate the profitability of its products. Hi-Tek’s ABCimplementation team concluded that $56,000 and $101,000 of thecompany’s advertising expenses could be directly traced to B300 andT500, respectively. The remainder of the selling and administrativeexpenses was organization-sustaining in nature. The ABC team alsodistributed the company’s manufacturing overhead to four activitiesas shown below:
| Manufacturing Overhead | Activity |
Activity Cost Pool (and Activity Measure) | B300 | T500 | Total |
Machining (machine-hours) | $ | 205,556 | | 90,800 | 62,600 | 153,400 |
Setups (setup hours) | | 125,050 | | 75 | 230 | 305 |
Product-sustaining (number of products) | | 100,600 | | 1 | 1 | 2 |
Other (organization-sustaining costs) | | 60,200 | | NA | NA | NA |
Total manufacturing overhead cost | $ | 491,406 | | | | |
|
Required:
1. Compute the product margins for the B300 and T500 under thecompany’s traditional costing system.
2. Compute the product margins for B300 and T500 under theactivity-based costing system.
3. Prepare a quantitative comparison of the traditional andactivity-based cost assignments.
Complete this question by entering youranswers in the tabs below.
- Required 1
- Required 2
- Required 3
Compute the product margins for the B300 and T500 under thecompany’s traditional costing system. (Round your intermediatecalculations to 2 decimal places and final answers to the nearestwhole dollar amount.)
|
| | B300 | T500 | Total | Product margin | | | $0 |
|
ompute the product margins for B300 and T500 under theactivity-based costing system. (Negative product margins should beindicated by a minus sign. Round your intermediate calculations to2 decimal places.)
|
| | B300 | T500 | Total | Product margin | | | $0 |
|
Prepare a quantitative comparison of the traditional andactivity-based cost assignments. (Round your intermediatecalculations to 2 decimal places and "Percentage" answers to 1decimal place and and other answers to the nearest whole dollaramounts.)
|
| | B300 | T500 | Total | | | % of | | % of | | | Amount | | | Amount | | | Amount | Traditional Cost System | | | | | | | | | | | % | | | % | | | | | % | | | % | | | | | % | | | % | | Total cost assigned to products | $0 | | | $0 | | | $0 | | | | | | | | | Total cost | | | | | | | $0 | | | | | | | | | | B300 | T500 | Total | | | % of | | % of | | | Amount | Total Amount | Amount | Total Amount | Amount | Activity-Based Costing System | | | | | | | | Direct costs: | | | | | | | | | | | % | | | % | | | | | % | | | % | | | | | % | | | % | | Indirect costs: | | | | | | | | | | | % | | | % | | | | | % | | | % | | | | | % | | | % | | Total cost assigned to products | $0 | | | $0 | | | 0 | Costs not assigned to products: | | | | | | | | | | | | | | | | | | | | | | | | Total cost | | | | | | | $0 |
|