Transcribed Image Text
In: AccountingGitano Products operates a job-order costing system and appliesoverhead cost to jobs on the basis...Gitano Products operates a job-order costing system and appliesoverhead cost to jobs on the basis of direct materials used inproduction (not on the basis of raw materialspurchased). Its predetermined overhead rate was based on a costformula that estimated $120,400 of manufacturing overhead for anestimated allocation base of $86,000 direct material dollars to beused in production. The company has provided the following data forthe just completed year:Purchase of raw materials$132,000Direct labor cost$82,000Manufacturing overhead costs:Indirect labor$122,700Property taxes$8,300Depreciation of equipment$17,000Maintenance$14,000Insurance$8,000Rent, building$32,000BeginningEndingRaw Materials$23,000$14,000Work in Process$45,000$40,000Finished Goods$71,000$60,000Required:1. Compute the predetermined overhead rate for the year.2. Compute the amount of underapplied or overapplied overheadfor the year.3. Prepare a schedule of cost of goods manufactured for theyear. Assume all raw materials are used in production as directmaterials.4. Compute the unadjusted cost of goods sold for the year. Donot include any underapplied or overapplied overhead in youranswer.5. Assume that the $40,000 ending balance in Work in Processincludes $8,300 of direct materials. Given this assumption, supplythe information missing below:
Other questions asked by students
As a new migrant, Lisa is currently considering to buy a bottle shop which will be...
A rigid stainless steel chamber contains 210 Torr of methane, CH4, and excess oxygen, O2, at...
Which of these was NOT characteristic of the first cells on Earth anaerobic O prokaryotic...
lon gradients are essential for cell function. In a mammalian cell, which of these ions...
Acircle has in weer of 32 sa What is the exact circum of the cirule...
I need help with checkig second half Mini practice set 1 in introduction to accounting...
Consider the following data and answer the questions. Standard Hours = 15 per unit of...