Flexible Budgets and Standard Cost Systems Using Excel to prepare a flexible budget performance report...

90.2K

Verified Solution

Question

Accounting

Flexible Budgets and Standard Cost Systems
Using Excel to prepare a flexible budget performance report
Pilchuck Company manufactures tote bags and has provided the following information for September 2018:
Use the blue shaded areas on the ENTERANSWERS tab for inputs.
Prepare a flexible budget performance report, including the heading. Use the ABS function when calculating variances, and use the drop-down selections for F or U when describing the variances. Note: start with calculating the budget amounts, then calculate variances and choose appropriate descriptions of the variances. (For variances with a zero amount, make sure to include the result of "0" in the appropriate cell and leave the drop-down to identify the variance as elther F or U blank.)
(Always use cell references and formulas where appropriate to receive full credit. If you copy/paste from the Instructions tab you will be marked wrong.)
Cell | Hint:
C13:C14, D12:D17, J12:J17| Use cell references to the values in the data table provided at the top of the Instructions worksheet for calculations. E13:E17, H13:H17, D25| Use the function =ABS() to calculate the variances.
F13:F17, I13:117| Do not choose the descriptions and leave cells blank if corresponding variances equal zero.
image

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students