Fisher Fixtures manufactures three types of lighting fixtures, with model names of Silver, Gold, and...

70.2K

Verified Solution

Question

Accounting

Fisher Fixtures manufactures three types of lighting fixtures, with model names of Silver, Gold, and Platinum. It applies all indirect costs according to an annual predetermined rate based on direct labor-hours. The plant controller has recommended that the company switch to an activity-based costing system. The controller's staff prepared the following cost estimates for next year (year 2) for the recommended cost drivers.
Activity Recommended Cost Driver Estimated Cost Estimated Cost Driver Activity
Purchasing material Number of purchase orders $ 135,600240 purchase orders
Receiving material Direct materials cost 244,800 $ 3,060,000
Setting up equipment Number of production runs 238,080120 runs
Machine depreciation and maintenance Machine-hours 82,62016,524 hours
Ensuring regulatory compliance Number of inspections 469,80054 inspections
Shipping Number of units shipped 1,101,600612,000 units
Total estimated cost $ 2,272,500
In addition, management estimated 45,000 direct labor-hours for year 2.
Assume that the following cost-driver volumes occurred in January, year 2:
Silver Gold Platinum
Number of units produced 32,00010,0003,000
Direct labor-hours 2,0001,200400
Number of purchase orders 763
Direct materials costs $ 97,500 $ 60,000 $ 37,500
Number of production runs 235
Machine-hours 700175100
Number of inspections 023
Units shipped 32,00010,0003,000
Labor costs are based on the contractual rate of $25 per hour.
Required:
Compute the predetermined rate for year 2 for use in the current product-costing system using direct labor-hours as the allocation base.
Compute the per-unit production costs for each model for January using direct labor-hours as the allocation base and the predetermined rate computed in requirement (a).
Compute the predetermined overhead rate for year 2 for each cost driver using the estimated costs and estimated cost driver units prepared by the controller's staff to be used in an ABC system.
Compute the per unit production costs for each product for January using the cost drivers recommended by the consultant and the predetermined rates computed in requirement (c).(Note: Do not assume that total overhead applied to products in January will be the same for activity-based costing as it was for the labor-hour-based allocation.)

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students