Factory Overhead Cost Variances The following data relate to factory overhead cost for the production...

70.2K

Verified Solution

Question

Accounting

Factory Overhead Cost Variances

The following data relate to factory overhead cost for the production of 5,000 computers:

Actual: Variable factory overhead $183,100
Fixed factory overhead 50,000
Standard: 5,000 hrs. at $44 220,000

If productive capacity of 100% was 8,000 hours and the total factory overhead cost budgeted at the level of 5,000 standard hours was $238,750, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $6.25 per hour. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Variance Amount Favorable/Unfavorable
Variable factory overhead controllable variance $
Fixed factory overhead volume variance
Total factory overhead cost variance $

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students