Factory Overhead Cost Variances
The following data relate to factory overhead cost for the production of 5,000 computers:
Actual: Variable factory overhead $145,500
Fixed factory overhead 48,000
Standard: 5,000 hrs. at $36180,000
If productive capacity of 100% was 8,000 hours and the factory overhead cost budgeted at the level of 5,000 standard hours was $198,000, determine the variable factory overhead Controllable Variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $6 per hour. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variance Amount Favorable/Unfavorable
Controllable variance $fill in the blank 1
Favorable
Volume variance $fill in the blank 3
Unfavorable
Total factory overhead cost variance:

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students