Exercise 5-29 (Static) Methods of Estimating Costs: Engineering Estimates (LO 5-1, 2) Ferdinand Construction (...

60.1K

Verified Solution

Question

Accounting

image
Exercise 5-29 (Static) Methods of Estimating Costs: Engineering Estimates (LO 5-1, 2) Ferdinand Construction ( EC ) manages the design and construction of hospitals. Ferdinand has developed several formulas that it uses to quote jobs. These include costs of basic construction but exclude equipment and furniture. These estimates are also dependent on the purpose of the hospital (teaching hospitals are more costly to buld) and location (downtown hospitals are more costly to build). Both of these are based on the building costs. The estimated costs also depend on whether the hospital has few or many stories (highrise bulidings are more expensive). The following are the cost estimates for one region in the Northeast: Required: A rural county government has requested an estimate to build a 200,000-5quare-foot hospital in a small city (though the largest in the county). it will be a single-story building and not affiliated with any teaching institution. Based on the engineering estimates above. what will such a hospital cost to build? Note: Enter your answers in thousands

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students