Exercise 4-10 Contrasting ABC and Conventional ProductCosts [LO4-2, LO4-3, LO4-4]Rocky Mountain Corporation makes two...Exercise...

70.2K

Verified Solution

Question

Accounting

Exercise 4-10 Contrasting ABC and Conventional ProductCosts [LO4-2, LO4-3, LO4-4]

Rocky Mountain Corporation makes two types of hikingboots—Xactive and Pathbreaker. Data concerning these two productlines appear below:

Xactive

Pathbreaker

Direct materials per unit

$

65.60

$

51.80

Direct labor cost per unit

$

19.00

$

13.80

Direct labor-hours per unit

1.4

DLHs

1

DLHs

Estimated annual production and sales

33,000

units

83,000

units

The company has a conventional costing system in whichmanufacturing overhead is applied to units based on directlabor-hours. Data concerning manufacturing overhead and directlabor-hours for the upcoming year appear below:


Estimated total manufacturing overhead

$2,687,360

Estimated total direct labor-hours

129,200

DLHs

Required:

1-a. Compute the predetermined overhead rate based on directlabor-hours.

1-b. Using the predetermined overhead rate and other data fromthe problem, determine the unit product cost of each product.

2. The company is considering replacing its conventional costingsystem with an activity-based costing system that would assign itsmanufacturing overhead to the following four activity costpools:

Estimated Overhead Cost

Expected Activity

Activity Cost Pools and Activity Measures

Xactive

Pathbreaker

Total

Supporting direct labor (direct labor-hours)

$

988,380

46,200

83,000

129,200

Batch setups (setups)

1,008,000

290

190

480

Product sustaining (number of products)

602,240

1

1

2

General factory (machine-hours)

88,740

3,300

8,300

11,600

Total manufacturing overhead cost

$

2,687,360

Determine the activity rate for each of the four activity costpools.

3. Using the activity rates and other data from the problem,determine the unit product cost of each product.

Answer & Explanation Solved by verified expert
4.4 Ratings (693 Votes)
Solution 1a predetermined overhead rate Estimated overhead Estimated direct labor hours 2687360 129200 2080 per direct labor hour Solution 1b Computation of unit product cost Traditional costing Particulars Xactive Pathbreaker Direct material per unit 6560 5180    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Transcribed Image Text

In: AccountingExercise 4-10 Contrasting ABC and Conventional ProductCosts [LO4-2, LO4-3, LO4-4]Rocky Mountain Corporation makes two...Exercise 4-10 Contrasting ABC and Conventional ProductCosts [LO4-2, LO4-3, LO4-4]Rocky Mountain Corporation makes two types of hikingboots—Xactive and Pathbreaker. Data concerning these two productlines appear below:XactivePathbreakerDirect materials per unit$65.60$51.80Direct labor cost per unit$19.00$13.80Direct labor-hours per unit1.4DLHs1DLHsEstimated annual production and sales33,000units83,000unitsThe company has a conventional costing system in whichmanufacturing overhead is applied to units based on directlabor-hours. Data concerning manufacturing overhead and directlabor-hours for the upcoming year appear below:Estimated total manufacturing overhead$2,687,360Estimated total direct labor-hours129,200DLHsRequired:1-a. Compute the predetermined overhead rate based on directlabor-hours.1-b. Using the predetermined overhead rate and other data fromthe problem, determine the unit product cost of each product.2. The company is considering replacing its conventional costingsystem with an activity-based costing system that would assign itsmanufacturing overhead to the following four activity costpools:Estimated Overhead CostExpected ActivityActivity Cost Pools and Activity MeasuresXactivePathbreakerTotalSupporting direct labor (direct labor-hours)$988,38046,20083,000129,200Batch setups (setups)1,008,000290190480Product sustaining (number of products)602,240112General factory (machine-hours)88,7403,3008,30011,600Total manufacturing overhead cost$2,687,360Determine the activity rate for each of the four activity costpools.3. Using the activity rates and other data from the problem,determine the unit product cost of each product.

Other questions asked by students