E2.6 (LO 1, 2, 3, 4), AP A job cost sheet of Sandoval Company is...

60.1K

Verified Solution

Question

Accounting

E2.6 (LO 1, 2, 3, 4), AP A job cost sheet of Sandoval Company is given below. JOB NO. 469 ITEM White Lion Cages FOR Todd Company Date 7/10 12 15 22 Direct Materials 690 900 1,600 1,500 24 27 31 Cost of completed job: Direct materials Direct labor Manufacturing overhead Total cost Unit cost Job Cost Sheet Direct Labor 440 380 540 Quantity 2,500 Date Requested 7/2 Date Completed 7/31 Manufacturing Overhead 550 475 675 Instructions a. Answer the following questions. 1. What are the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job? 2. Overhead is applied on the basis of direct labor cost. What is the predetermined manufacturing overhead rate? 3. What are the total cost and the unit cost of the completed job? b. Prepare the entry to record the completion of the job on July 31. Prepare entries for manufacturing and nonmanufacturing costs.
image
a. Answer the following questions. 1. What are the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job? 2. Overhead is applied on the basis of direct labor cost. What is the predetermined manufacturing overhead rate? 3. What are the total cost and the unit cost of the completed job? b. Prepare the entry to record the completion of the job on July 31. trepare entries for manufacturing and nonmanufacturing costs

Answer & Explanation Solved by verified expert
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students