Discuss the challenges posed by the drilling activities on reservoir completion.

50.1K

Verified Solution

Question

Civil Engineering

Discuss the challenges posed by the drilling activities onreservoir completion.

Answer & Explanation Solved by verified expert
3.6 Ratings (450 Votes)
The reservoirs are drilled in the fluid to reduce the over all cost of the completion of the reservoir because drilling of the reservoir leads to increase in the production rateThe reservoir drilling fluid can be define as the fluid which possesses the same requirement as the conventional drilling fluid while exhibiting non damaging characterstics to both the formation and completion of the reservoirMaximizing productivity is the key objective in the design of optimum reservoir    See Answer
Get Answers to Unlimited Questions

Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!

Membership Benefits:
  • Unlimited Question Access with detailed Answers
  • Zin AI - 3 Million Words
  • 10 Dall-E 3 Images
  • 20 Plot Generations
  • Conversation with Dialogue Memory
  • No Ads, Ever!
  • Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!
Become a Member

Other questions asked by students