Dirt must be excavated for the foundation of a building 36 yards by 11 yards to a depth of 8 ya How many trips will it take to haul the dirt away if a truck with a capacity of 4 cu yd is used trips are required to haul the dirt away

Answer & Explanation Solved by verified expert