Crane Companybudgeted manufacturing costs for 30000 tons of steel are:

Fixed manufacturing costs $50000 per month
Variable manufacturing costs $12 per ton of steel

Craneproduced 20000 tons of steel during March. How much is the flexible budget for total manufacturing costs for March?

$410000

$240000

$290000

$280000