90.2K
Verified Solution
Link Copied!
Costs for which of the following activities should not be included in research and development (R&D)?
a. modification of the formulation or design of a product or process
b. design of tools, jigs, molds, and dies involving new technology
c. design, construction, and testing of preproduction prototypes and models
d. trouble-shooting in connection with breakdowns during commercial production
Answer & Explanation
Solved by verified expert